CGA H-11 PDF

Original price was: $82.00.Current price is: $49.00.

Safe Startup and Shutdown Practices for Steam Reformers, Second Edition

Published by Publication Date Number of Pages
CGA 05/20/2020 19

Tips: This document only available in PDF format.

Category:

CGA H-11 – Safe Startup and Shutdown Practices for Steam Reformers, Second Edition

CGA H-11 applies to steam reformers that are operated with natural gas, refinery off gas, naphtha, and other light hydrocarbon streams. It specifically applies to large volume hydrogen production plants, defined for this publication as a production capacity of 380 000 scfh (10 000 Nm3h) (9 MMSCFD or 240 000 Nm3D) or greater. This publication may be applied to smaller reformers depending on the technology used.

This publication covers operational safety of steam reformer startup and shutdown. Emphasis is placed on operational guidance and features that provide safeguards against the hazards associated with the transition and infrequent nature of startups and shutdowns. The publication is not intended to address the details of design, installation, construction, and initial startup (commissioning) of steam reformers.

Edition

2nd

Published

05/20/2020

Number of Pages

19

File Size

1 file , 1 MB

Note

This product is unavailable in Russia, Ukraine, Belarus

Reviews

There are no reviews yet.

Be the first to review “CGA H-11 PDF”

Your email address will not be published. Required fields are marked *

CGA H-11 PDF
$82.00 Original price was: $82.00.$49.00Current price is: $49.00.