ANS 2.23 PDF

Original price was: $207.00.Current price is: $124.00.

Nuclear Plant Response to an Earthquake

Published by Publication Date Number of Pages
ANS 04/07/2016 59

Tips: This document only available in PDF format.

Category:

ANS 2.23 – Nuclear Plant Response to an Earthquake

ANS 2.23-2016 describes actions that the owner of a nuclear power plant shall take to prepare for and respond to a felt earthquake at the plant(s), including the need for plant shutdown; actions to determine the readiness of the plant to resume operation; and those evaluations necessary to verify the long-term integrity of safety-related and important structures, systems, and components. It also includes a consensus definition of operating basis earthquake exceedance, beyond which U.S. regulations require plant shutdown. Application of this revised standard provides a comprehensive, balanced plan for the response of a nuclear power plant to an earthquake.

This standard does not cover those operator actions that are performed in connection with safe operation and control of the nuclear power plant during and following an earthquake. These operations are specified in plant operating procedures, emergency procedures, alarm response procedures, and other conditions of the plant’s license. Likewise, it does not cover required reporting and communications with the U.S. Nuclear Regulatory Commission. It is not applicable to nuclear facilities other than licensed nuclear power plants.

Keywords: BWR boiling water reactor, nuclear power plant design, nuclear facility operations, PWR pressurized water reactor

Published

04/07/2016

ANSI

ANSI Approved

Number of Pages

59

File Size

1 file , 1000 KB

Redline File Size

2 files , 7.7 MB

Note

This product is unavailable in Ukraine, Russia, Belarus

Reviews

There are no reviews yet.

Be the first to review “ANS 2.23 PDF”

Your email address will not be published. Required fields are marked *

ANS 2.23 PDF
$207.00 Original price was: $207.00.$124.00Current price is: $124.00.